Design Plan for Steel Structure Construction Organization

Time:[2023-7-27]  Hits:2857

1、 Project Overview


Construction unit:


Project Name:


Construction unit:


Construction structure:


2、 Construction preparation


2.1 Skill Preparation

 


1. Before the official start of construction, on-site skill briefing work will be carried out in conjunction with the Planning Institute. After reviewing and positioning the guide points, a construction wire point measurement and control network will be established before the start of construction.


2. Conduct on-site verification of skill documents, familiarize yourself with the content of the documents, and based on construction investigations, promptly submit problems in the planning to the planning unit for resolution. Together, make supplementary construction drawings according to construction needs.


3. Based on the construction site investigation, planning documents, and the requirements of the owner, prepare an implementation construction organization plan, organize and guide the construction.


4. Prepare a special construction plan based on the planning documents.


5. Organize the debris, garbage, etc. within the construction site boundary.


6. Arrange a construction team to enter the site and prepare for construction.


7. Preparation of construction personnel, equipment, and materials, as well as skilled management personnel for this project, with equipment in place to meet construction requirements.


8. Do a good job of pre job training and safety education, communicate with all parties together, contact material sources, and acknowledge the transportation routes.


9. Select and implement construction teams with construction skills and experience that can ensure project quality to undertake various construction missions


2.2 Data preparation


Before leaving the factory, the steel components should be inspected by the manufacturer in accordance with the relevant specifications of the manufacturing specifications and the requirements of the planning diagram, and quality reports and actual error values should be filled out. After the steel components are delivered to the structural installation unit, the structural installation unit will conduct re inspection or spot check based on the quality report of the manufacturing plant and the classification of the components according to their properties


2. Based on the construction drawings, calculate the quantity of each main consumption data (such as welding rods, welding wires, etc.) and connecting parts (such as high-strength bolts, ordinary bolts), make order arrangements, and acknowledge the arrival time


3. After the quantity of temporary support, steel structure assembly platform, scaffolding support, safety protection, and environmental protection equipment required for each construction process is recognized, they will be arranged to enter the factory for manufacturing and installation.


2.3 Primary equipment


In steel structure construction, the main machines commonly used include: AC/DC welding machine, C02 gas shielded welding machine, Bench grinder, wire rope, rigging, Dumpy level, etc.


2.4 Operating conditions


1. The joint review of various planning plans has been completed.


Based on the structural deepening drawings, verify the stress conditions of the components during the steel structure installation, scientifically predict their possible deformation, and take corresponding reasonable technical measures to ensure the smooth operation of the steel structure installation


The review of construction plans for each special type of work has been completed.


The reinforced concrete foundation has been completed and passed the acceptance.


Temporary electricity and water supply for construction are laid in place.


6. Mobilization of labor force


7. The construction equipment and devices have passed the debugging and acceptance.


The incoming acceptance inspection of 8 components is qualified.


3、 Steel structure construction process


3.1 Process flow


Preparation of components, equipment, and personnel → Setting out and inspection of lines (axis and elevation) → Acceptance of embedded bolts and treatment of foundation surface → Component centerline and elevation line → Installation of column and beam center structure → Initial and final tightening of high-strength bolts → Welding of column to column nodes → Spot welding of beams and columns and beam joints → Scattered component (corner support) devices → Device pressed square steel → Welding and bolt connection


3.2 Operation process


1. Steel structure lifting sequence


Steel structure lifting generally requires distinguishing the lifting operation area, and steel structure lifting is carried out together in parallel order according to the distinguished area. After the lifting of a certain area is completed, measurement, calibration, and initial tightening of high-strength bolts are carried out. After several areas are installed, the overall measurement, calibration, final tightening of high-strength bolts, and welding are carried out. After welding and retesting, proceed to the lifting of the next section of the steel column. And according to the actual situation on site, carry out the lifting and partial laying operations of this laminated steel plate.


2 bolt embedment


The accuracy of the column orientation depends on the accuracy of the embedded bolt orientation. Control the elevation error of embedded bolts within+ Within 5mm, the error in positioning the axis should be controlled within ± 2mm.


3 Steel column installation process


Section 1 Steel Column Hoisting


(1) Setting of lifting points


The orientation and number of lifting points are recognized based on the specific conditions of the steel column shape, section, length, and crane function. Generally, steel columns have good elasticity and rigidity, and the lifting point adopts a single point positive lifting. The lifting point is set at the top of the column, with the column body vertical and passing through the center of gravity of the column, making it easy to lift, align, and calibrate. When multiple components are assembled into expanded units on the ground for installation, the lifting point should be accounted for and recognized.


(2) Lifting method


1. In multi-storey and high-rise steel Structural engineering, steel columns are generally lifted by a single machine, and for special or overweight components, double machines can also be used.


2. When lifting, it is necessary to keep the steel column straight and try to reverse and straighten it without dragging the root. During the lifting reversal process, attention should be paid to preventing collisions with other components that have already been lifted, and the sling should have a certain effective height. When lifting the first section of the steel column, a protective sleeve should be added to the embedded anchor bolt to avoid damaging the thread of the anchor bolt when the steel column is in place


3. The first section of the steel column is installed on the column base. Before installing the steel column, the climbing ladder and hanging basket should be hung in the predetermined position of the steel column and firmly bound. After lifting in place, the foundation bolts should be temporarily fixed and the straightness should be checked. The two sides of the steel column are equipped with temporary fixing connecting plates. After the upper section of the steel column is aligned with the center line of the lower section of the steel column top, the connecting plates are temporarily fixed with bolts.


It is necessary to wait for the anchor bolts to be fixed before loosening the sling.


(3) Steel column proofreading


Steel column proofreading requires three tasks: adjusting the elevation of the column base, adjusting the axis of the column base, and proofreading the straightness of the column body. Throughout the entire process, measurement is the primary focus.


1. Column base elevation adjustment


After placing the steel column, use the nuts or elevation adjustment blocks under the column bottom plate to control the elevation of the steel column (because some steel columns are too heavy, bolts and nuts cannot bear their weight, so a height adjustment block - steel plate adjustment elevation - needs to be added under the column bottom plate). The accuracy can be controlled within ± 1mm. The gaps reserved under the column bottom plate can be filled with high-strength, slightly expanded, and non-shortened mortar using the grouting method. When adjusting the elevation of the column base plate using nuts, the strength and stiffness of the anchor bolts should be calculated.


2. Adjustment of column bottom axis in the first section


Alignment method: Without loosening the hook of the crane, align the four points on the column base plate with the control axis of the steel column and slowly lower to the planned elevation direction.


3. Correction of Column Body Straightness in the First Section


Use cable wind rope calibration method. Use two 90 ° Theodolite to straighten. During the calibration process, continuously fine tune the nuts under the column base plate until the calibration is completed. Screw on the two nuts above the column base plate. The cable wind rope is loosened without force, and the column body is in a free state. Then recheck it with a Theodolite. If there is a slight error, repeat the above process until there is no error, and tighten the upper nuts. The nut on the anchor bolt is usually a double nut, which can be welded firmly with the screw after the nut is tightened.


Weld the nut and screw firmly.


4. Adjustment of column top elevation and control of other structural steel column elevations


There are two methods for adjusting the top elevation of columns and controlling the elevation of other structural steel columns: one is to install according to the relative elevation, and the other is to install according to the planned elevation. Generally, relative elevation devices are used. After the steel column is lifted in place, the connecting ear plates connecting the upper and lower steel columns should be fixed with large hexagonal high-strength bolts, but they should not be tightened too tightly. After being lifted by a crane, the crowbar can adjust the gap between the columns. Measure the pre calibrated elevation values of the upper and lower column tops, and after meeting the requirements, use steel wedges and spot welding to limit the drop of the steel column. Considering the welding seam and compression deformation, adjust and control the elevation error within 4mm.


5. Section 2 Steel Column Axis Adjustment


To ensure that the upper and lower columns do not show staggered joints, try to ensure that the centerline of the upper and lower columns overlaps as much as possible. The center line error of the steel column should be adjusted within a range of 3mm each time. If the error is significant, it should be adjusted 2-3 times. The positioning axis of each steel column is absolutely not allowed to use the positioning axis of the next steel column. It should be led from the ground control line to high altitude to ensure that each steel column device is correct and prevent excessive accumulation of errors.


6. Section 2 Steel Column Straightness Calibration


The key to proofreading the straightness of steel columns is to pre check the relevant dimensions of the steel columns. The straightness error at the top of the lower steel column is a comprehensive result of the bottom axis, displacement, welding deformation, sunlight effect, straightness correction, and elastic deformation of the upper steel column. Partial errors can be eliminated by reserving straightness error values. When the reserved value is greater than the accumulated error value of the next column, only the accumulated error value is reserved. Otherwise, the reserved value is reserved, and its direction is opposite to the error direction. Empirical value measurement: The general weld seam shortening value between beams and columns is less than 2mm; The shortening value of the column to column weld seam is generally 3.5mm


4. Steel beam installation process


1. Steel beam device


Steel beam devices are generally lifted using tool type lifting lugs or binding methods. Before installation, the center symbol of the steel beam should be introduced to the end of the steel beam to facilitate temporary positioning according to the positioning axis of the column bracket during lifting.


2. Calibration of steel beams


Proofreading includes elevation adjustment, vertical and horizontal axis adjustment, and straightness adjustment. It is necessary to proofread the steel structure beam after the structure forms a stiffness unit.


3. Elevation adjustment


Use a Dumpy level to stand on the beam or a specially erected platform to measure the elevation of both ends of each beam, weighted average all the data, and calculate a standard value. Calculate the elevation adjustment values of each point based on the standard values.


4. Vertical and horizontal axis calibration


Use a Theodolite to lead the axis to the column, determine the distance between the center line of each beam and the axis, pull a long rope (or use a Theodolite) on the center line of the beam top, and use a chain block to adjust the beam ends one by one. After the longitudinal and transverse axes of the steel beam meet the requirements, recheck the span of the structural beam.


5. Straightness proofreading


Straightness correction: Hang a hammer ball from the upper flange of the beam and measure the horizontal spacing between the wire rope and the upper and lower parts of the beam web. Adjust again based on the inclination of the beam (a ≠ a ') to make a=a.


6. Special rust removal equipment is used for rust removal, and shot rust removal can improve the fatigue strength and corrosion resistance of steel. The hardness of the steel surface is also improved to varying degrees, which is conducive to the adhesion of the paint film without the need for additional coating thickness. The abrasive used for rust removal must comply with quality standards and process requirements, and the relative humidity of the construction environment should not exceed 85%.


The surface of the steel after rust removal must be cleaned with tools such as a brush before proceeding to the next process. If the surface of the steel after rust removal is qualified and has returned to rust before applying primer, it needs to be re rust removed.


7. Paint


After passing the inspection of rust removal on the steel, the first layer of primer is applied on the surface. Generally, after the rust removal is completed, it is stored in the factory and can be coated within 24 hours. If stored outside the factory, the primer should be painted on duty. The paint should be applied in accordance with the planning requirements. After the first coat of primer is dry, the intermediate and top coats should be applied to ensure that the thickness of the coating meets the planning requirements. The paint should be evenly applied without sagging during the brushing process.


4、 Key points of quality acceptance


1 base and support surface


The positioning axis of the building, the positioning axis and elevation of the columns on the foundation, the specifications and orientation of the anchor bolts (anchor bolts), and the fastening of the anchor bolts (anchor bolts) should meet the planning requirements.


The fastening should meet the planning requirements.


2 Devices and proofreading


1. Steel components should comply with planning requirements and regulations. The deformation and coating detachment of steel components caused by transportation, stacking, and lifting should be corrected and repaired.


2. For nodes that require top tightening, the touch surface should not be less than 70% tight, and the maximum edge gap should not be greater than 0.8mm.


3. The surface of the steel structure should be clean, and the primary surface of the structure should be free of scars, mud, and other dirt.


When the steel component is installed on a concrete column, the error between its support center and the positioning axis should not exceed 10mm


5. Steel platforms, ladders, and railing devices in multi-layer and high-rise steel structures should comply with the current national standards of "Fixed Steel Vertical Ladders" (GB4053.1), "Fixed Steel Inclined Ladders" (GB4053.2), "Fixed Protective Rails" (GB4053.3), and "Fixed Steel Platforms" (GB4053.4).


5、 Product protection


1. High strength bolts, studs, welding rods, welding wires, etc. are stacked on shelves in the warehouse, with a maximum of four layers of stacking.


2. The stacking of steel components requires the site to be flat, sturdy, clean, dry, neatly stacked, with sleepers underneath, and to be resistant to deformation and rust.


3. It is not allowed to weld or cut completed components arbitrarily, or stack objects in the air. Welds and node plates that have been completed and inspected as qualified should be immediately sorted out and sealed as required.


When lifting the steel structure into position, it should be slowly lowered and should not collide with the already installed steel structure.


5. Carefully manage the manufactured steel columns, etc., to prevent the unreasonable placement of cushion base points from bending and deformation.


6、 Environmental and occupational health and safety control measures


1 Environmental control measures


1. When welding, steel pipes are used to set up protective railings, and colored cloth is used to surround the railings to prevent the exposure of arc light and welding smoke and dust.


2. Waste generated during and after construction should be recycled and treated.


2 Occupational Health and Safety Measures


1. It is necessary to include the safety skills and measures for operations, as well as the required equipment, in the construction organization plan of the project.


2. Corresponding responsibility systems should be established for unit project construction. Before construction, safety skill education and disclosure should be carried out step by step, and all safety skill measures should be implemented. Construction should not be carried out without implementation.


3. It is necessary to inspect the facilities and equipment used in high-altitude operations before construction, and only after acknowledging their integrity can they be put into use.


4. It is necessary for climbing and suspended operators to hold a certificate and undergo regular professional knowledge assessment and physical examination. It is necessary to wear a safety helmet, fasten a seat belt, wear anti slip shoes, and carry a tool bag when on duty.


5. The high-altitude operation area should have clear signs and be guarded by dedicated personnel. Personnel unrelated to lifting are prohibited from entering. During crane operation, no one is allowed to stand within the rotating radius of the boom.


6. When transporting lifting components, it is prohibited to stand on the components to command and place materials and tools.


7. It is necessary to bind the components firmly, and the lifting point should pass through the center of gravity of the components. When lifting, it should be stable to prevent vibration or oscillation.


8. When working at heights, safety nets need to be installed to prevent accidents caused by personnel, materials, and tools falling or flying out.


9. All objects that may fall from the construction site should be removed or fixed first. The materials used in high-altitude operations should be stacked steadily and not obstruct passage and loading and unloading.


10. When conducting high-altitude operations on rainy and snowy days, it is necessary to take reliable anti slip, cold and freezing measures. Water, ice, frost, and snow should be promptly removed. Before construction, go to the local meteorological department to understand the situation and take measures to prevent typhoons, rain, freezing, cold, and high temperatures. Before and after the snowstorm and typhoon rainstorm, the safety facilities for high-altitude operation shall be checked one by one, and the problems found shall be improved immediately.


11. During the process of structural installation, it is not allowed to operate in the same straight direction when each type of work is engaged in vertical crossing operations. The orientation of the lower level operation needs to be outside the radius of the possible falling range recognized according to the height of the upper level; When the above conditions are not met, a safety protection layer should be set up.


7、 Issues to pay attention to


The quality of pre assembled steel components should meet the planning requirements and quality specifications. The length dimensions of components such as columns, beams, and supports should include deformation values such as welding shortening allowance.


The detection of device errors should be carried out after the structure forms a spatial stiffness unit and is connected and fixed.


When installing 3 devices, it is necessary to control the construction load of the platform flooring, and the construction load must not exceed the bearing capacity of beams, deck slabs, platform flooring, etc.


Only after the installation, welding, and bolting of all components of each column are completed and accepted can the positioning axis of the previous column be measured from the ground.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
最近的最新的中文字幕视频| 北条麻妃人妻在线| 国产经典在线播放| 亚洲一区乱码在线观看| 亚洲精品人成网址| 中文av字幕在线观看一区| 人妻少妇精品在线视频| 粉嫩av在线综合| 美女把逼给男人操| 天天操天天射天天干天天爱 | 日韩精品色图在线| 精品熟女人妻在线视频| 另类日韩一区二区三区| 又黄又爽的视频在线观看| 嫩草九九九精品乱码一二三| 少妇人妻一区二区网站| 少妇熟女一二三区| 成人理论在线播放| 美女色网站在线不卡粉嫩av| av在线精品观看资源网| 亚洲免费观看毛片| 国产av激情国产熟女| 精品人妻交换视频在线看| 亚洲国产欧美另类| 国产一区二区欧美视频| 亚洲男人一区二区三区| 美女让男人捅尿眼捅爽| 91国产免费视频国产免费| 亚洲欧美精品卡一卡二卡三| 亚洲不卡免费在线| 精品在线欧美日韩| 欧美成人精品三级在线| 一区三区四区精品| 91精品国产一二三产区区别在哪| 成人亚洲自拍一区| 亚洲中文字幕视频免费在线| 淫妇天天干夜夜操| 免费黄色特级大片| 亚洲在线一区二区在线观看| 性生活久久久久久久久| 亚洲在线一区二区在线观看| 天堂男性av在线| 91红桃在线观看| 国产探花熟女av在线| 青青草原国产在线精品| 伦理片一区二区三区在线观看| 日本黄色日比视频| 亚洲一区二区三区四区在线网站| 成人动漫在线观看播放| 手机在线日韩av| 高潮喷水在线欧美| 欧美日韩少妇熟女| 1024在线国产视频| 成人理论在线播放| 91蜜桃视频精品| 国产91在线播放网址| 亚洲超爽美女毛片| 国产一区二区三区自拍欧美| 夜夜嗨av老熟女一区二区三区| 黄色强奸片免费观看视频免费看 | 人妻精品av99| 亚洲av色图网站| 欧美精品国产字幕| 伦理片一区二区三区在线观看| 一区二区三区av资源网| 网页端在线聊天室| 亚洲一级做a爰片| 操操操操夜夜夜夜| 久久人人妻人人妻人人澡av| 深夜视频在线四区| 麻豆96在线观看| 青青爽视频免费在线观看| 成人在线av网站| 在线观看日韩黄色蜜桃| 91在线视频亚洲| 丰满熟女人妻一区二区hd| 草原免费视频亚洲| 日本五十路熟女网| 国内在线视频精品一区美女| 日韩国产欧美激情在线视频| 鸡巴插洞穴的软件免费试看| 2025av熟女| 青青视频成人免费完整版| 日韩国产成人一区| 深夜美女福利诱惑| 亚洲一区二区三区三州| 欧美国产日本精品| robolox涩涩的视频免费看| 国产一区视频免费观看| 2025av熟女| 久草视频播放在线| 蜜月久综合久久综合国产| 狠狠操你在线观看| 丝袜人妻av中文字幕| 亚洲中文字幕乱码七糟| 亚洲乱码精品乱码精品中文 | 在线看成人a v| 国产精品淫语av播放| a在线视频播放免费网站| 疯狂人妻丝袜系列| 日韩一区二区三区五十路人妻| 欧美黄色激情一区二区| 在线播放一区日韩| 国产欧美日韩在线观看免费| 红桃在线观看av| 青青草国产在线免费观看| av资源在线一区二区三区| 成人短视频在线版| 国产av高潮大全| 欧美男女啪啪真人视频| 青青草国产在线免费观看| 亚洲天堂成人在线观看| 超碰成人97在线| 久久精品国产亚洲av麻豆软| 欧洲免费无线码在线一区| 日韩 欧美 偷拍自拍| 日韩免费黄色在线| 欧美风情日韩国产黑白配| 伊人久久婷婷综合五月97色| 国产在线视频观看| 国产精品黑丝美腿美臀| 久久视频在线观看| 天天色天天干网址| 午夜xb福利视频| 亚洲天堂嗯啊嗯啊| 亚洲天堂国产精品区| 四十路g五十路熟女豊满av| 婷婷丁香亚洲五月天| 91 亚洲 在线| 成人校园春色小说| 熟女91n一区二区三区| 丝袜 成人 av| 熟妇 人妻 中文| 熟女 av在线 一区二区| 男人能不能亲女生的秘密| 久久人妻精品二区| 亚洲一卡2卡3卡4卡5卡| 国产精品久久久久久人妻爽| 91精品国产一二三产区区别在哪| 蜜臀av在线素人人妻播放一区| 美腿丝袜综合在线日韩| 日韩伦理免费大片| 中文av字幕在线观看一区| 粉嫩av在线综合| 深夜激情小视频在线观看| 99国产小视频在线播放| 成人黄色av在线播放| 亚洲成av人片一区二区久久久| 人妻中文字幕精品| 国产精品黑丝美腿美臀| 亚洲欧美另类视频| 99久久免费精彩视频| 日本女优在线三区| 福利深夜在线观看| 欧洲免费无线码在线一区| 久久日韩美女人妻精品| 国产97在线视频| 1024日韩精品一区二区| 久久国产成人精品免费视频| 青青草视频 成人| 97碰碰碰免费公开在线视频| 精品免费污污网站在线观看| 欧美精品久久久久三级| 丝袜诱惑亚洲一区| 日韩免费黄色在线| 嫩草九九九精品乱码一二三| 中文字幕人妻在线| 国产精品原创中文巨作av| 亚洲一区乱码在线观看| 日韩美女少妇av| 国产熟女av一区| 日本黄色日比视频| 欧美无吗一区二区三区| 人妻色图欧美日韩| 88成人美女女内射| 久久综合日韩欧美| 亚洲一区两区三区四区| 欧美日一区二区三区免费在线| 久久九精品综合丝袜影视精品| 国产91在线播放网址| 日韩乱码99在线视频| 日本影片高清视频| 国产精品久久久美女爽av| 欧美国产日本精品| 亚洲青青青草在线免费视频| 亚洲一卡2卡三卡| 成人午夜毛片在线| 久久人妻精品二区| 美女夜夜操天天干| 日本视频一区免费| 色婷婷a区一区二区三区| 人妻精油按摩系列| 国产99丝袜诱惑| 一区二区三区在线视频精品| 喝醉漂亮人妻被强了中字| 午夜熟女经典一区二区| 久操在线免费观看视频| 亚洲女人av在线| 内地av青青在线观看| 亚洲精品无码中文字幕无码| 国产视频在线观看播放| 最新日韩在线观看视频| 一级国产黄片国语对白| 精品欧美日韩免费| 日韩超碰97在线观看| 亚洲精品在线观看av密乳av| 人妻少妇精品在线视频| 2019成人在线视频| 97资源超碰成人| 在线 人妻 视频| 四虎av在线观看| av资源在线一区二区三区| 欧美亚洲第28页| 成人日韩亚洲欧美| 欧美成人破处视频| 四虎av在线观看| 日本伦理视频在线| 最新日韩在线观看视频| 青青操视频在线观看免费观看| 国产自拍在线网站| 日韩超碰97在线观看| 自拍偷拍亚洲首页| 亚洲欧美另类视频| 美女福利视频午夜| 亚洲精品免费天堂| 91国自产精品一区二区三区| 亚洲一卡2卡三卡| a在线视频播放免费网站| 黄色一级成人大片| 亚洲国产天堂在线| 日韩亚洲丝袜美腿久久| 天天综合天天精品| 性感丝袜美女诱惑| 亚洲国产长腿丝袜av天堂| 中文字幕人妻熟女人妻视频 | 伊人av在线播放| 亚洲综合制服丝袜另类在线| 国产卡一卡二专区| 在线人妻视频观看| 超碰97在线在线观看| 极品校花口爆吞精| 99国产小视频在线播放| 欧美日韩少妇熟女| 啪啪国产视频自拍| 亚洲国产长腿丝袜av天堂| 88成人美女女内射| 久久午夜国产精品| 黄视频在线观看免费观看| 在线观看视频瑟瑟| 亚洲欧美另类视频| 色婷婷激婷婷深爱五月老司机| 变态另类影音资源| 一区三区四区精品| 精品熟女人妻在线视频| 青青青操国产在线视频| 国产精品久久久久久av大片| 蜜臀av国内精品久久久久久| 最近的最新的中文字幕视频| 啪啪视频一区三区| 最大的黄色亚洲网站在线观看| 美女激情国产精品| 国产一区二区三区女人的床叫声| 性生活久久久久久久久| 国产精品久久久久免费播放 | 精彩视频久久久久| 中文字幕有码系列| 国产一区免费在线视频观看| 熟女主播福利视频| 国产精品欧美日韩精品| 国产精品原创中文巨作av | 国产熟女av一区| robolox涩涩的视频免费看| 久久人人妻人人妻人人澡av| av人妻精品一区二区三区| 国产一区二区欧美视频| 免费福利精品视频| 美女激情国产精品| eeuss一区二区人妻| 美女夜夜操天天干| 婷婷丁香亚洲五月天| 亚洲中文资源在线| 天天色天天干网址| 红桃在线观看av| aise美乳诱惑| 熟女91n一区二区三区| 伊人av在线播放| 精品熟女人妻在线视频| 精彩视频久久久久| 九色原创自拍视频| 亚洲一卡2卡三卡| 精彩视频久久久久| 熟女乱一区二区三区四区| 青青青操国产在线视频| 美女黄频蜜桃av| 和大屁股女人臀交| 四虎日韩在线观看| 在线视频国产香蕉岛国| 国产高跟丝袜av| 日本爱片在线观看| 亚洲男人一区二区三区| 美女色网站在线不卡粉嫩av| 久久热中文在线观看| 欧美 成人 一区 二区| 偷拍99免费视频| 黄色一级网站免费在线播放| av伊人网好吊妞| 亚洲情色 一区二区三区| 午夜xb福利视频| 成人黄色伦理网站| 把高跟丝袜美腿扛在肩上| 亚洲丝袜美女诱惑| 丝袜 成人 av| 十八禁在线无遮挡| 亚洲美女在线激情| 精品人妻一区二区免费| 大香蕉伊人久久草| 99在线播放免费视频| 无人妻一区二区三区费中文字幕| 国产强上美女在线观看| av影音在线不卡| txtv在线视频| 中文字幕免费无卡| 神马一区二区三区伦理片| 熟女阿b老熟女一区| 亚洲人妻熟女一区二区三区| 亚洲熟女激情av| 大量老熟女偷拍视频老女人| 美女夜夜操天天干| 亚洲成av人片一区二区久久久 | 大量老熟女偷拍视频老女人| 日本精品一区二区三区在线精品| 日本精品一区二区三区在线精品| 色婷婷激婷婷深爱五月老司机| 97资源总站中文字幕| 免费少妇一区二区三区| 成人精品一区二区三区的电影| 亚洲中文字幕视频免费在线| 97碰碰碰免费公开在线视频| 手机av永久免费| 在线 亚洲 精品| 亚洲一级做a爰片| 国产欧美一区视频在线观看| 日韩超碰97在线观看| 精彩视频久久久久| 人妻av乱片av出轨| 中文字幕免费无卡| 亚洲av变态另类| 人人澡人人妻人人爽少妇| 2020国内自拍视频| 亚洲乱码国产乱码精品精可以看| 中文字幕色123| 亚洲中文字幕乱码七糟| av天堂亚洲激情| 国产裸体一二区三区视频| 蜜桃臀av永久在线| 国产精品久久久精品久久| 99国产小视频在线播放| 狠狠干狠狠操少妇| 国产视频97在线播放| 1024日韩精品一区二区| 国产黑色丝袜在线| 天天操天天射天天干天天爱| 人妻熟妇av在线| 偷拍99免费视频| 伊人av在线播放| 美女把逼给男人操| 97视频都是精品| av丰满激情人妻在线| 成人日本免费视频| av在线一区二区三区地区| 五月婷中文字幕网| 亚洲一卡2卡三卡| 老司机中文视频网| 97在线观看国产免费视频| 久久午夜激情视频| 亚洲日本熟妇高清| 日本在线高清视频| 亚洲三级黄色av| 日韩中文字幕三区| 国产探花熟女av在线| 人妻一区二区三区精品高| 久草视频播放在线| 精品av综合一区二区三区| 亚洲美女高潮久久| 又黄在线免费观看视频| 亚洲一区二区三区四区在线网站| 91涩漫在线观看| 亚洲啊v男人天堂| 中文字幕日韩在线av| 欧美精品国产字幕| 国产精品乱码av| 人妻av乱片av出轨| 91涩漫在线观看| 免费福利精品视频| 淫妇操BBB操BBB操BBB| 凹凸视频一二三区在线观看| 成人黄色av在线播放| 3d黄色在线网站| 红桃在线观看av| 在线视频青青青草| 国产欧美日韩在线观看免费| 国产第一影院草草影院久久| 在线播放一区日韩| 欧洲免费无线码在线一区| 欧美黄色激情一区二区| 大片一级黄片一级| 国产精品综合不卡| sese欧美日韩| 亚洲精品免费天堂| 日韩国产欧美激情在线视频| 亚洲综合色区另类小说| 日韩超碰97在线观看| 国产精品人妻激情| 高潮喷水在线欧美| 亚洲444kkkk在线观看| 91精品激情在线视频| 亚洲天堂网 丝袜制服| 亚洲 成人 av 在线| 97视频都是精品| 91红桃在线观看| 日韩超碰97在线观看| 精品欧美日韩免费| 亚洲丝袜美女诱惑| 亚洲性感天堂欧美| 亚洲最快福利视频| 国产九色91在线视频| 精品国产免费久久久久尖叫| 97免费公开视频观看| 久久女人撒尿视频| 午夜免费福利视频| 极品在线激情av| 2025av熟女| 婷婷国产成人在线| 国产精品人妻在线| 欧美精品国产字幕| 国产av日韩av| 国产一区精品视频免费播放| eeuss一区二区人妻| 一级黄色片录像片| 成人亚洲自拍一区| 精品一区二区三区 蜜臀av| 成人中文字幕专区| 亚洲伊人久久在线| 成人国产精品一区二区视频下载| 成人精品国产一级二级| 精品国产免费久久久久尖叫| 亚洲三级黄色av| 青青操视频在线观看免费观看| 人妻少妇精品在线视频| av人妻精品一区二区三区| 91学生片黄在线网站| 亚洲av超清在线| 精品av综合一区二区三区| 亚洲精品无码中文字幕无码| 一区三区四区精品| 免费福利精品视频| 88成人美女女内射| 黄色录像一级片大| 亚洲啪啪啪一区二区三区| 日本伦理在线不卡| 国产av日韩av| 免费高清理伦片在线播放视频| 黑丝美女被后入在线观看| 免费av资源网址| 伦理片一区二区三区在线观看| av丰满激情人妻在线| 九九在线观看视频国产剧情| 亚洲中文av字幕综合| 国产精品v白虎逼| 欧美日韩激情免费在线视频| 青青青操国产在线视频| 好看的av网站中文字幕| 日韩美女精品视频| 精品人妻免费av| 波霸肥熟女bbw| 欧美性受xxxx人妻xyv狂| ysl蜜桃棕调色| 波霸肥熟女bbw| 久久综合日日夜夜| 国产高跟丝袜av| 亚洲美女天堂av| 国产懂色av熟女丝袜精品| 精品欧美日韩免费| 午夜免费福利视频| 制服丝袜亚洲另类| 国产探花熟女av在线| 美女激情国产精品| 亚洲人妻一区二区在线观看| 国产在线视频观看| 欧美成人金8天国加勒比| 亚洲成人天堂久久| 少妇被插激情视频| 中文字幕观看一区二区| 日韩精品中文字幕巨臀人妻中出 | 九九热在线视频精品1| 蜜臀精品人妻社区一区| 亚洲天堂网 丝袜制服| 国产情侣自拍成人| 激情啊啊啊啊啊啊啊| 激情av五月婷婷| 亚洲av软件在线| 午夜8050网站二级| 亚洲一卡2卡3卡4卡5卡| 国产av高潮大全| 美女色网站在线不卡粉嫩av| 伊人网综合高清在线播放| 久碰久摸久看在线观看| 国产日韩欧美一区激情| 中文字幕色123| 成人av电影网站日韩| 粉嫩一区二区性色粉嫩av| 在线 亚洲 精品| 中文av字幕在线观看一区| 日本伦理视频在线| 国产经典在线播放| 成人精品国产一级二级| 极品人妻探花av| 国产一区调教在线| 国产久久精品视频在线观看| 中文字幕一级不卡| 超碰97在线在线观看| 日日操夜夜操天天高潮| 777 亚洲天堂| 四虎av在线观看| 成人伊人精品色xxxx视频| 最大的黄色亚洲网站在线观看| 国产精品久久久久久人妻爽| 国产精品亚洲欧美一级久久精品| 青青草国产在线免费观看| 嫩草九九九精品乱码一二三| 调教女m在线观看| 蜜月久综合久久综合国产| 黄黄的视频靠在线观看| 性感美女黄色刺激视频| 欧美一区二区三区免费的网址| 麻豆96在线观看| 谁有av网站在线播放中文字幕| 人人妻人人爽97| 亚洲岛国av在线| 亚洲精品亚洲成人| 视频一区二区蜜桃| 国产成人在线免费视频| 大香蕉伊人久久草| 伊人网综合高清在线播放| 四虎日韩在线观看| 青青青青啪啪啪啪网站| 另类视频免费播放观看| 成人黄色性a大片| 四十路g五十路熟女豊满av| 欧美亚洲第28页| 免费丝袜av二区| 日韩乱码99在线视频| 最近的最新的中文字幕视频| 91在线在线免费视频| 久操在线免费观看视频| 日本视频一区免费| 蜜臀精品人妻社区一区| 中文人妻熟妇精品乱又伧不卡| 人妻人妻1区2区| 成人亚洲自拍一区| 国产精品视频福利在线| 激情中文字幕视频| 久久综合日韩欧美| sese欧美日韩| 色吧中文字幕在线| 亚洲天堂网 丝袜制服| 日本黄色日比视频| 色在线观看aaa| 色综合色综合网站| 国产熟女一本区三区四区| 中文字幕乱码视频欧美| 国内美女直播视频| 中文字幕乱码视频欧美| 深夜美女福利诱惑| 美女扒开逼逼让男人操| 黄片激情在线观看| 日韩99中文字幕在线视频| 青青爽视频免费在线观看| 亚洲成人天堂久久| 黄色强奸片免费观看视频免费看 | 乱码欧美中文字幕日韩| 乱色熟女综合一区二区| 中文字幕偷拍av| 91精品激情在线视频| 午夜三级二区三区| 激情人妻一区二区三区| 久操在线免费观看视频| 国产一级激情黄色av| 国产精品久久久久久av福利| 国产一区调教在线| 在线国产99视频在线观看| 精品免费污污网站在线观看| 亚洲免费观看毛片| 91国产av精品| 自拍偷拍美腿丝袜亚洲| 久草视频福利在线观看精品| txtv在线视频| 国产av高潮大全| 谁有av网站在线播放中文字幕| 动漫天堂同人av| 午夜av网站观看| 色婷婷a区一区二区三区| 超碰97在线在线观看| 国产一级激情黄色av| 少妇人妻一区二区网站| 美女把逼给男人操| 2025av熟女| 国产一区二区在线激情欧美| 国产婷婷精品av在线| 黄色一级成人大片| 熟女 av在线 一区二区| 美国av韩国av国产av| 久久久无码av一区二区三区| 丝袜 成人 av| 亚洲一区天堂在线| 操操操操夜夜夜夜| 粉嫩av在线综合| 亚洲av超清在线| 亚洲欧美日韩激情视频| 久久综合日日夜夜| 小明看看成人在线免费视频| 亚洲三级黄色av| 91福利共享久久精品| 日韩不卡在线av| 日本免费观看一区| 五十路熟女人妻在线网观看| 国产经典在线播放| 在线观看视频瑟瑟| 欧美一区二区三区国产| 成人黄色伦理网站| 亚洲第一蜜桃av| 亚洲天堂网 丝袜制服| 久久久精品国产人妻在线观看| 国产情侣自拍成人| 久久日韩美女人妻精品| 国产精品色悠悠在线观看| 亚洲国产天堂资源| 日韩免费三级视频| 国产精品久久久久久av福利| 久久女人撒尿视频| 日韩99中文字幕在线视频| 亚洲天堂嗯啊嗯啊| 婷婷国产成人在线| 玖玖在线视频精品| 美女激情国产精品| 黄色大片长久网站| 中文人妻一区二区视频| 亚洲综合自拍成人偷拍网站| 婷婷国产成人在线| 动漫天堂同人av| 亚洲日本熟妇高清| 五十路熟女人妻在线网观看| 中文字幕亚洲天堂| 久久久久人妻精品一区三寸| 内地av青青在线观看| 草原免费视频亚洲| 黑丝美女被后入在线观看| 国内美女直播视频| 丝袜 成人 av| 人妻精油按摩系列| 97资源总站中文字幕| 激情中文字幕视频| 国产精品久久国产丁香花| 大香蕉伊人免久久| av毛片大全亚洲| 久久人人妻人人妻人人澡av| 免费少妇一区二区三区| 亚洲欧美精品卡一卡二卡三| 91精品激情在线视频| 中文字幕日韩在线av| 熟女91n一区二区三区| 91在线视频亚洲| 福利深夜在线观看| 久久午夜激情视频| 久久久99久久久蜜桃| 成人午夜毛片在线| 国产自拍各种精品视频| 神马一区二区三区伦理片| 又黄又爽的视频在线观看| 久久综合日日夜夜| 欧美性欧美视频这里只有| 成人免费av专区| 亚洲精品无码中文字幕无码| 亚洲激情综合图区| 青青视频成人免费完整版| 丝袜 成人 av| 天天操天天射天天干天天爱| 玩弄丰满人妻一区二区av| 日韩美女少妇av| 美腿丝袜综合在线日韩| 中文字幕日韩人妻一区| 亚洲av超清在线| 国产一级激情黄色av| 成人在线av网站| 午夜内射视频在线观看| 亚洲 欧美 日韩 人妻在线| 91麻豆久久国产视频| 人妻 中文字幕 森泽佳奈| 丝袜美腿免费在线| 免费一区二区三区四区av| 国产高跟丝袜av| 日韩国产成人一区| 淫妇操BBB操BBB操BBB| 自拍另类亚洲欧美| 国产视频欧美一区二区| 偷拍99免费视频| 亚洲字幕中文精品| 久久激情欧美在线播放| 亚洲熟女激情av| 中文字幕123一区二区三区| 蜜臀亚洲综合av一区二区三区| 欧美情色伦理在线| 亚洲欧美精品卡一卡二卡三| 日韩中文字幕三区| 亚洲精品成人日本| 亚洲av网址观看| 国产一区二区在线激情欧美| 男人操女人中国产视频| 日韩人妻中文字幕视频| 青青草原vip在线视频| 日韩色图欧美视频| 国语自产拍在线观看视频| 一级片一级黄色片| 午夜8050网站二级| 亚洲444kkkk在线观看| 欧美日韩乱码视频在线免费观看| 精品91久久99九九| av爱爱亚洲一区| 国产蜜桃av在线观看| 熟女主播福利视频| 丝袜美脚av一区| 亚洲女人av在线| 伦理疯狂精油按摩| 东京热制服人妻诱惑| 精品毛片av一区二区三区| 成人校园春色小说| 欧美极品激情一区二区三区| 人妻一区二区三区精品高| 欧美三级免费观看一区二区| 国产高跟丝袜av| 天堂av中文字幕乱码免费看| 亚洲在线久久伊人| 九九热在线视频精品1| 精品欧美日韩免费| 午夜激情福利大片| 精品毛片av一区二区三区| 人妻精品一二三区| 国产自拍各种精品视频| 91国产av精品| 成人国产精品一区二区视频下载| 国产婷婷精品av在线| 欧美av一区二区三区四区| 在线a亚洲视频播放视频观看 | 亚洲精品无码中文字幕无码| 俺去啦视频在线精品| 国产自拍免费在线观看视频| 午夜av网站观看| 亚洲av黄久久久| av爱爱亚洲一区| 婷婷av在线免费观看| 亚洲在线一区二区在线观看| 丝袜诱惑亚洲一区| 欧美国产午夜一区二区| 亚洲乱码精品乱码精品中文| 亚洲中文资源在线| 九九热在线视频精品1| av爱爱亚洲一区| 性感美女黄色刺激视频| 久久成人综合亚洲精品欧美| 精品国产免费久久久久尖叫| 黄色强奸片免费观看视频免费看| 美女福利视频午夜| 人人澡人人妻人人爽少妇| 红桃在线观看av| 国产视频欧美一区二区| 可以试看的黄大片| 日韩免费三级视频| 久久久久亚洲国产av| 偷拍另类激情小说| 日本伦理视频在线| 高潮喷水在线欧美| 国产裸体学生视频全黄网站| 青青操视频在线观看免费观看| 神马一区二区三区伦理片| 香蕉久久久久久久av网站| 又黄在线免费观看视频| 91在线视频亚洲| 另类视频免费播放观看| 俺去啦视频在线精品| 国产伦理精品av| 女人的天堂av网| 黄色强奸片免费观看视频免费看 | 精产国品一二三产品区别在| 欧美日韩少妇熟女| 黄色强奸片免费观看视频免费看| 看久了久久久久久久久久| 亚洲美女天堂av| 波霸肥熟女bbw| 乱码欧美中文字幕日韩| 天堂男性av在线| 欧美亚洲第28页| 欧美情色免费视频| 人妻av乱片av出轨| 日本欧美三级高潮受不了| 亚洲伊人久久在线| 国产亚洲精彩免费视频| 乱色熟女综合一区二区| 四十路g五十路熟女豊满av| 日本伦理在线不卡| 大片一级黄片一级| 俺去啦视频在线精品| 丝袜美腿免费在线| 美女穿丝袜美腿热吻男人| 黄黄的视频靠在线观看| 玩弄丰满人妻一区二区av| 亚洲乱码精品乱码精品中文| 好看的av网站中文字幕| 亚洲精品免费天堂| 中文字幕av人妻呻吟| 日韩精品中文字幕巨臀人妻中出| 国产夫妻啪啪自拍| 亚洲人妻丝袜在线观看| sese欧美日韩| 亚洲最快福利视频| 国产精品久久久精品久久| 精彩视频久久久久| 丝袜人妻诱惑在线| av网站国产在线| av爱爱亚洲一区| 激情中文字幕视频| 日韩中文字幕三区| 激情av五月婷婷| 国产精品久久久精品久久| 激情边亲边摸视频| 一区二区三区四区av| 熟女乱一区二区三区四区| 老熟妇高潮一区二区三| 一区二区三区四区av| 国产av专区网站大全| 激情边亲边摸视频| 老熟妇高潮一区二区三| 大香蕉伊人久久草| 午夜精品视频在线观看视频| av老司机亚洲精品天堂| 精品欧美日韩免费| 在线观看大片免费网站观看| 亚洲天堂网 丝袜制服| 亚洲一区二区三区四区在线网站| 人妻色图欧美日韩| 黄色录像一级片大| 日本欧美三级高潮受不了| 午夜免费观看视频一区二区| 内地av青青在线观看| 蜜臀av在线素人人妻播放一区| 日韩精品中文字幕巨臀人妻中出| 欧美情色免费视频| 中文一区二区人妻| 国产麻豆黄色大片| 中文一区二区三区在线播放| 天天综合天天精品| 谁有av网站在线播放中文字幕| 午夜免费福利视频| 日韩免费黄色在线| 国产三级国产精品久久成人| av丰满激情人妻在线| 人妻少妇精品在线视频| 成人理论在线播放| 啄木乌av一区二区三区| 在线a亚洲视频播放视频观看| 黄色成人在线私拍| 暴露美女高潮喷水| 又黄又爽的视频在线观看| 国产精品乱码av| 青青草免费国产视频| 九色原创自拍视频| 中文字幕av久久爽伊人一级| 91国自产精品一区二区三区| aise美乳诱惑| 天堂男性av在线| 国产裸体学生视频全黄网站| 午夜精品在线观看成人| 亚洲欧美另类视频| 成人日本免费视频| 日本伦理在线不卡| 青青草原vip在线视频| 日韩丝袜情趣美女图片| 国产精品久久久久久av大片|